References
End-To-End Solution
Fast EV DC Charging Installation
60kW DC Fast Charger installation at outdoor to TNB fleet electrical vehicles.
Smart Energy Meter
Over 1,000,000 units of smart meter deployed across Melaka, Klang Valley and the Federal Territories.
Our smart meter is essential to the utility sector to replace conventional meters as our national grids become more flexible, efficient and adaptable to new technologies with full integration to Automatic Meter Reading (AMR) and Head-End Systems (HES).
Our smart meter is essential to the utility sector to replace conventional meters as our national grids become more flexible, efficient and adaptable to new technologies with full integration to Automatic Meter Reading (AMR) and Head-End Systems (HES).
Supply and install AMI phase two’s infrastructure worth RM6.5 million. Under this phase, there are about 1600 sites to be completed and installed with AMI equipment including gateway, extender bridge, nan collector and repeater, by all vendors in Kuala Lumpur and several areas in Selangor. | |
Arc Protection Relay
Over 515 of TNB substation are being protected by our arc protection systems for over 15 years.
We have been protecting substations for the past 10 years in utility, oil & gas and commercial facilities and have long and proven track record.
We have been protecting substations for the past 10 years in utility, oil & gas and commercial facilities and have long and proven track record.
Earth Fault Indicators
Over 147,000 nos of EFI installed in TNB substation and are being monitored by our Earth Fault Indicators (EFI) products.
We have been supplying products and services to various utility companies that are reliable and effective.
We have been supplying products and services to various utility companies that are reliable and effective.
Fibre-Composite Crossarm
Replacement of existing damaged and aging steel crossarms with fibre-composite material to more than 30 transmission towers in Malaysia.
Smart Water Meter
Proof of Concept done in conjunction with Air Selangor were successful in the Sepang region.
We have developed our meter with an in-house team and successfully passed this stage and soon to become a pioneer of smart water in the water utility sector.
We have developed our meter with an in-house team and successfully passed this stage and soon to become a pioneer of smart water in the water utility sector.
Battery Energy Storage System
Project at Jiangsu Commercial and Industrial Application of 5MW & 20MW.
Rural Community Broadband
Fiber speed internet using wireless technology.
Fibre Cable Project
The contract includes supply of material, services including civil works, installation, testing, delivery at site, commissioning, standby, preventive maintenance, corrective maintenance, guarantee against fault and abnormal degradation, planned and unplanned repair works.
Engineering, Procurement, Construction & Commissioning
Replacement of Electrical Distribution System at Menara Takaful Malaysia
Syarikat Takaful Malaysia Keluarga Berhad
Syarikat Takaful Malaysia Keluarga Berhad
Renewable Energy
SME Technopreneur Centre, CyberjayaCapacity: 425kWpCommissioned: 2013 |
Ikea Cheras, Kuala LumpurCapacity: 1,002 kWpCommissioned: 2015 |
Pasir Gudang, JohorCapacity: 425kWpCommissioned: 2015 |
Prai FTZ, CyberjayaCapacity: 425kWpCommissioned: 2016 |
Chenderiang, Perak – Ground MountedCapacity: 50,000 kWpIn progress: Est. Completion date 2024 |
Beris Dam, Kedah – Floating SolarCapacity: 54,000kWpIn progress: Est. Completion date 2023 |